                   Managed Serves, preventive, and corrective and change managmement services for ooredoo wireless network , Microware links and Towers distributed all over Qatar.
| Client | Ooredoo | 
| Project Status | Ongoing | 
| Project Start Date | 2023 | 
| Project End Date | 2026 | 
| Location | Multiple locations in Qatar | 
 
                  
                  Engineering , supply, installation, integration and support for 2 years for the new ground to air radio communication system for the civil aviation, the scope includes the build of new radio site ~200sq meters, all MEP works, 2 towers, radios , integration with existing Civil aviation systems
| Client | Qatar Civil Aviation Authority | 
| Project Status | Ongoing | 
| Project Start Date | 2023 | 
| Project End Date | 2026 | 
| Location | Near Ruwais | 
 
                  
                  Supply installation and commissioning of the expansion for the DWDM and storage blades at Kahrama Datacenters
| Client | Kahramaa | 
| Project Status | Ongoing | 
| Project Start Date | 2023 | 
| Project End Date | 2026 | 
| Location | Doha | 
 
                    
                    EPIC project delivery to upgrade the OTN System from OTN 600 Classic to XTran and the LOS Microwave Radio Link from NSN FlexiPacket to DragonWave-X Harmony Enhanced
| Client | Dolphin Energy Ltd | 
| Project Status | Ongoing | 
| Project Start Date | 2023 | 
| Project End Date | 2026 | 
| Location | DOL-1, DOL-2, CCR, Tank Storage | 
 
                    
                    EPIC contract to replace and upgrade the UPS system and replace backup batteries at 250 locations distributed all over qatar
| Client | Ooredoo | 
| Project Status | Ongoing | 
| Project Start Date | 2023 | 
| Project End Date | 2023 | 
| Location | Multiple locations in Qatar | 
 
                   
                   Operations and Preventive and Corrective Maintenance services of QNBN data centers (COs and RLUs) situated all around Qatar. Systems include Generator, ATS, FM200, Building Management System, Access Control System, CCTV and maintain the fiber link to and from these data centers
| Client | QNBN | 
| Project Status | Ongoing | 
| Project Start Date | 2022 | 
| Project End Date | 2024 | 
| Location | Multiple locations in Qatar | 
 
                   
                   Managed services for QatarEnergy SDH network.
| Client | QatarEnergy | 
| Project Status | Ongoing | 
| Project Start Date | 2022 | 
| Project End Date | 2024 | 
 
                    
                    Supply, Installation, Commissioning and Maintenance of CCTV System, including Fiber & Copper Network, Active Components, Civil Work, Storage, UPS system
| Client | Qatar Foundation | 
| Project Status | Ongoing | 
| Project Start Date | 2022 | 
| Project End Date | 2022 | 
| Location | Qatar Academy Msheireb | 
 
                    
                    Plan, Design, Survey, Supply, Construction, and Commissioning of Fiber Optic Network and Infrastructure
| Client | QNBN | 
| Project Status | Ongoing | 
| Project Start Date | 2021 | 
| Project End Date | 2025 | 
| Location | Multiple locations in Qatar | 
 
                  
                  Supply, Installation, Testing & Commissioning of 5kW Wind Turbine System at Kahramaa Awareness Park + EPC for 1 x Monopole of height = 15m, Dismantling & Decommissioning of 3 x Monopole of height = 30m + Operation & Maintenance
| Client | Kahramaa | 
| Project Status | Ongoing | 
| Project Start Date | 2021 | 
| Project End Date | 2024 | 
| Location | Doha | 
 
                 
                 Supply, installation, testing & commissioning of fiber optic and structured cabling network
| Client | Qatar Foundation / Meeza | 
| Project Status | Ongoing | 
| Project Start Date | 2014 | 
| Project End Date | 2024 | 
| Location | Multiple locations in Qatar | 
 
               
               Supply of manpower for GIS Planning Engineers
| Client | Ooredoo | 
| Project Status | Ongoing | 
| Project Start Date | 2019 | 
| Project End Date | 2024 | 
| Location | Doha | 
 
               
               Managed Services for VFQ fiber optic Network
| Client | Vodafone | 
| Project Status | Ongoing | 
| Project Start Date | 2019 | 
| Project End Date | 2024 | 
| Location | Doha | 
 
             
             Preventive and Corrective Maintenance of Outdoor Solar Test Facility at Qatar Foundation and Solar Stations installed at multiple remote locations for Qatar Metrological Department (QMD)/
| Client | Qatar Foundation-QEERI | 
| Project Status | Ongoing | 
 
             
             Installation of PV panels and soiling sensor. Installation of PV structure and foundation. Installation of Meteo Station and multiple data loggers. Installation of remote monitoring setup
| Project Status | Ongoing | 
 
                
                Supply, Installation, Testing & Commissioning of 5kW Wind Turbine System at Kahramaa Awareness Park + EPC for 1 x Monopole of height = 15m, Dismantling & Decommissioning of 3 x Monopole of height = 30m + Maintenance for 02 years / YOC: On-going
| Client | Kahramaa | 
| Project Status | Ongoing | 
 
                
                Operations and Preventive and Corrective Maintenance services of QNBN data centers (COs and RLUs) situated all around Qatar. Systems include Generator, ATS, FM200, Building Management System, Access Control System, CCTV and maintain the fiber link to and from these data centers
| Client | QNBN | 
| Project Status | Ongoing | 
| Location | Multiple locations | 
 
         
         EPIC/ turnkey project delivery of a Centralized Vessel Monitoring and Alerting System (CVMAS) comprised of AIS Software, AIS Base Stations, VHF Marine Base Stations.
| Client | QatarEnergy | 
| Project Status | Ongoing | 
| Project Start Date | 2024 | 
| Project End Date | 2026 | 
| Location | Offshore | 
 
            
            EPIC/ turnkey services for the implementation of a new fully redundant with no single point of failure, highly available SBM Oil Loading Communication & Shutdown Radio System.
| Client | QatarEnergy | 
| Project Status | Ongoing | 
| Project Start Date | 2020 | 
| Project End Date | 2027 | 
| Location | Offshore |